2018-10-17 ; 0.30 hr ; No Charge – Solar Array Stopped by TRS solar array to measure signal and throughput while standing at the inverters. Verified strong connectivity and tested throughput at 20 Mbps. 2018-10-17 ; 0.30 hr ; No Charge – EMD Laptop Met Ed Mical at Town Hall to investigate why EMD laptop …
Continue reading “Warner DPW / TRS Solar Array Connectivity Issue | EMD Laptop Antivirus”